Hydropower Project Planning: Capsule Summary

Hydropower, Hydropower Planning, Renewable Energy, Hydroelectric Power, Nepal Hydropower, Global Hydropower, Hydropower Potential, Energy Generation, Hydropower Plants, Hydropower in Nepal

Key Points:- Gross Potential: 83 GW Technical Potential: 44 GW Economical Potential: 42 GW Gross Potential: 38,607 TWhr/yr Technical Potential: 14,605 TWhr/yr Economical Potential: 8,772 TWhr/yr World: 1416 GW China: 421 GW Brazil: 110 GW USA: 102 GW Canada: 83 GW Nepal: 3 GW Survey: 5 yrs (Period) Generation: 30 yrs (Export)                        35 yrs … Read more

Powerhouse Planning

powerhouse, hydropower, surface powerhouse, underground powerhouse, machine hall, control bay, loading bay, power generation

1.1 Classification, general arrangement and layout plan of powerhouse Power house: Classification of powerhouse: a. Surface powerhouse: b. Underground powerhouse: General arrangement of powerhouse: 1.Superstructure: 2.Intermediate structure: 3.Sub structure: 1.2 General dimension calculation of powerhouse 1.Machine hall (Unit bay) a. Length: Where, D= Diameter of turbine b. Width: c. Height: 2. Loading Bay: 3. Control … Read more

Hydro mechanical and Electromechanical Equipment

hydropower, turbines, generators, draft tube, centrifugal pump, reciprocating pump, hydro-mechanical, electro-mechanical equipment

1.1 Hydro mechanical installation in powerhouse Hydro mechanical equipment: Turbine: Classification of hydraulic turbine A. Based on nature of energy head possessed by water at inlet 1. Impulse or velocity turbine 2. Reaction turbine B. Based on direction of flow 1. Tangential flow turbine 2. Radial flow turbine 3. Axial flow turbine 4. Mixed flow … Read more

Spillways and Energy Dissipaters

Energy Dissipation, Hydropower, Stilling Basin, Flip Bucket, Ski-Jump, Hydraulic Structures

1.1 Spillway Function of spillway: Types of spillway: A. Based on control mechanism a. Controlled spillway: b. Uncontrolled spillway: B. Based on purpose a. Main spillway: b. Auxiliary spillway: c. Emergency spillway: C. Based on prominent feature a. Free fall spillway: b. Ogee spillway: c. Side channel spillway: d. Chute spillway: e. Siphon spillway: Cavitation: … Read more

Water Conveyance Structure

1.1 Introduction to power canal, its suitability in hydropower project Power Canal: Suitability of canal in hydropower system 1.2 Hydraulic tunnels Tunnel: Types of tunnel: a.Pressure tunnel: b.Non-pressure tunnel: Purpose of tunnel: Advantage of tunnel: Disadvantage of tunnel: Shape and size of tunnel: Size of tunnel: Shape of tunnel: a.Circular section: b.D-shape section: c.Horse-shoe shape: … Read more

Run-of-River layout of components in a typical power plant

Hydropower, Run-of-River, Renewable Energy, Power Plant Components, Water Intake, Sediment Management, Settling Basin, Hydraulic Design

1.1 General layout of components in a typical power plant 1.Diversion weir: 2.Intake: 3.Gravel trap: 4.Settling basin: 5.Headrace canal: 6.Penstock: 7.Power house: 8.Tailrace: 1.2 Different type of intake Intake Function: Location of intake: Types of intake: 1. Runoff river intake: a.Side intake: b.Frontal intake: c.Drop intake or Bottom rock intake: 2.Reservoir intake: a.Dam intake: b.Tower … Read more

Power and energy potential study

Power and energy potential study

1.1 Gross, net, operating and design head Gross head: Net head: Operating head: Design head: 1.2 Plant and installed capacity Plant capacity: Installed capacity: Power (P) = η⋅ρ⋅g⋅H⋅Q Where, P = Power (Watts) η = Efficiency of the system (decimal form, typically 0.7–0.9) ρ = Density of water (≈1000 kg/m³) g = Acceleration due to … Read more

Planning and Investigation of Hydropower Projects

hydropower, hydropower project, renewable energy, feasibility study, environmental assessment, reservoir planning, climate change, engineering planning

1.1 Hydropower project planning stages Hydropower project planning stages is divided into three main categories:- 1. Reconnaissance Objective: Major steps are:- 2. Prefeasibility Objective: Major steps are:- 3. Feasibility Objective: Major steps are: 1.2 Hydrological data processing a. Mass curve: Characteristics: Uses: b. Flow Duration Curve (FDC): Characteristics: Use: 1.3 Reservoir planning and regulation Reservoir: … Read more