Hydropower Project Planning: Capsule Summary

Hydropower, Hydropower Planning, Renewable Energy, Hydroelectric Power, Nepal Hydropower, Global Hydropower, Hydropower Potential, Energy Generation, Hydropower Plants, Hydropower in Nepal

Key Points:- Gross Potential: 83 GW Technical Potential: 44 GW Economical Potential: 42 GW Gross Potential: 38,607 TWhr/yr Technical Potential: 14,605 TWhr/yr Economical Potential: 8,772 TWhr/yr World: 1416 GW China: 421 GW Brazil: 110 GW USA: 102 GW Canada: 83 GW Nepal: 3 GW Survey: 5 yrs (Period) Generation: 30 yrs (Export)                        35 yrs … Read more

Micro Hydropower Plant

micro hydropower, renewable energy, rural electrification, hydropower policy, Nepal energy, sustainable development, AEPC

1.1 Introduction, scope and application Micro hydropower plant: Scope: Application: 1.2 Introduction to policy of Micro Hydropower Plant development in Nepal Various policies of government regarding Micro Hydro Development in Nepal: Highlights of different hydropower development policies: 1.3 Advantage and relevance of Micro Hydropower in Nepal References:

Run-of-River layout of components in a typical power plant

Hydropower, Run-of-River, Renewable Energy, Power Plant Components, Water Intake, Sediment Management, Settling Basin, Hydraulic Design

1.1 General layout of components in a typical power plant 1.Diversion weir: 2.Intake: 3.Gravel trap: 4.Settling basin: 5.Headrace canal: 6.Penstock: 7.Power house: 8.Tailrace: 1.2 Different type of intake Intake Function: Location of intake: Types of intake: 1. Runoff river intake: a.Side intake: b.Frontal intake: c.Drop intake or Bottom rock intake: 2.Reservoir intake: a.Dam intake: b.Tower … Read more

Planning and Investigation of Hydropower Projects

hydropower, hydropower project, renewable energy, feasibility study, environmental assessment, reservoir planning, climate change, engineering planning

1.1 Hydropower project planning stages Hydropower project planning stages is divided into three main categories:- 1. Reconnaissance Objective: Major steps are:- 2. Prefeasibility Objective: Major steps are:- 3. Feasibility Objective: Major steps are: 1.2 Hydrological data processing a. Mass curve: Characteristics: Uses: b. Flow Duration Curve (FDC): Characteristics: Use: 1.3 Reservoir planning and regulation Reservoir: … Read more