Engineering Geology Archives - OnlineEngineeringNotes https://onlineengineeringnotes.com/category/engineering-geology/ A Complete Guide to future Engineers Wed, 20 Jul 2022 15:15:56 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.2 SOIL MECHANICS: Permeability, Determination of Coefficient of Permeability, Lab Method & Field Method, Confined & Unconfined Aquifer https://onlineengineeringnotes.com/2022/07/20/soil-mechanics-permeability-determination-of-coefficient-of-permeability-lab-method-field-method-confined-unconfined-aquifer/ https://onlineengineeringnotes.com/2022/07/20/soil-mechanics-permeability-determination-of-coefficient-of-permeability-lab-method-field-method-confined-unconfined-aquifer/#respond Wed, 20 Jul 2022 15:14:18 +0000 https://onlineengineeringnotes.com/?p=1269 Water has the most significant effect on the behavior of soil. Gravitational water: Percolates through the soil under gravity Pore water pressure at GWT = 0 Soil above GWT is saturated by capillary action (pore water pressure is tensile and negative = -ϒwh) Above GWT – impervious formation above- local saturation Water occurring at local ... Read more

The post SOIL MECHANICS: Permeability, Determination of Coefficient of Permeability, Lab Method & Field Method, Confined & Unconfined Aquifer appeared first on OnlineEngineeringNotes.

]]>
Water has the most significant effect on the behavior of soil.

Gravitational water:

  • Percolates through the soil under gravity
  • Pore water pressure at GWT = 0
  • Soil above GWT is saturated by capillary action (pore water pressure is tensile and negative = -ϒwh)
  • Above GWT – impervious formation above- local saturation
  • Water occurring at local saturation – perched water

Held water:

  • Water held in soil pores other than gravity.

Types of Held Water:

Structural Water

  • Remains in the crystal structure of soil minerals chemically, cannot removed by normal drying (105-1100C)

Hygroscopic Water

  • Removed by normal drying, replaced back
  • Capillary Water
  • Due to surface tension

Height of Capillarity = 4T/ϒwd

Note:

Soil Suction: in case of capillary tube, water above WT has a ‘-‘ pressure, soil remains in a state of reduced pressure, known as soil suction (PF = log10(hc))

Permeability:

  • Flow of water through interconnected voids.

Darcy’s Law :

Laminar flow:

  • Flow follows a well-defined path and doesn’t cross the path of other particles (Re ≤ 2000)

Turbulent flow:

  • Fluctuates with the time both in magnitude and direction (Re ≥ 2000)

v ∝ i

v = ki

q = vA = Aki

therefore, q= Aki

Seepage Velocity:

Seepage Velocity > Avg. Velocity (v = q/A; vs = q/As)

q = v*A = vs*As

vs =v* A/As

     = v V/vs

     = v/n

     = ki/n

K = cd2 * (e3/(1+e)) * (ϒw/μ)

K ∝ c

K ∝ (1/μ) 

{(KT/K20) = (μ20T)}

K ∝ e

K ∝ T (tempr)

Note:

  • Impurities (salts, alkalis) increases, K decreases
  • Entrapped air, k decreases

Determination of coefficient of Permeability:

(A) Laboratory Method:

Constant Head Method (k > 10-4)

  • Coarse grained soil
  • Constant head of water at supply tank
  • Vol. of water flowing out of permeameter per unit time = q

H= head water level – tail water level

kstone > ksoil

From Darcy’s law

q = Aki

   = Ak h/L  

 Where L = soil specimen ht.

Therefore,

k = qL/Ah

= qL/(A*h*t)   

Where,

k = (k1+K2+ ………………Kn)/n

Falling head method (10-7 <K< 10-4)

  • Undisturbed sample
  • Fine-grained soils
  • A standpipe of area ‘a’ above the cylinder
  • Variable head (h1 to h2) at time t

 rate of change of head = -dh/dt

Acc. Darcy’s Law

q = A*k*i

a*v = A*k*i

-a* (dh/dt) = A*k* (h/L)

After Integrating from 0 to t and from h1 to h2;

K = 2.303*(q/A) *(L/t) *log10(h1/h2)

Note:

  • soil in the permeameter should be fully saturated.

Determination of Coeff. Of Permeability (Field):

(B) In-situ method:

  • More reliable than the lab method

(a) Pumping test (pumping out)

  • Continuous pumping from test well and observation in bore wells (observation well) till steady state.
  • Min. two observation wells
  • Well should penetrate full depth of water-bearing strata

Confined Aquifer – upper and lower surface impervious

Unconfined Aquifer- no overburden lying over them, top most water-bearing strata.

Unconfined Aquifer:

Observation wells – (r1 and r2 apart test well)

Ht. of observations wells – (z1 and z2)

i = dh/dr

z =ht. of water level at a distance, r

A= 2π*r*z

Darcy’s law;

q = kAi

   = 2π*r*z* dh/dr

On integrating;

K = {2.303*q*log10(r2/r1)}/ {π*(zz2 – z12)}

If only one observation well;

K= {2.303*q*log10(R/rw)}/ {π*(H2 – hw2)}

R = Radius of influence

H = depth to the bottom of the aquifer from WT

Rw = radius of the test well

Hw = ht. of water in the test well

 Confined Aquifer:

r, r1, r2 – same as above

z.z1.z2 – ht. from the bottom impervious layer (same as above)

b= spacing between two layers

i= dz/dr

A = 2π * r* b

q= kAi

= k * dz/dr * 2π*r*b

On integrating,

K = {q*log10(R/rw)}/ {2.727*b*(h – hw)}

R = 3000*d*√k, R in m

d = draw down, m

k= Coeff. of permeability, m/sec

(b) Bore Hole Test

Constant head method:

  • Water    is allowed to flow through the bottom of the bore
  • Low end of the casing should not be less than 5d from the top and bottom of the stratum.
  • Water level in borehole = constant

Therefore, k = q/(2.7*d*h)

Where d = dia. of well

H = head above GWT

Variable head method:

  • Drop from h1 to h2
  • For D ≤ 1.5 m

k = (πd/11t) * log(h1/h2)

  • For D > 1.5 m

K= (πd2/81t) * log (2L/d) * log (h1/h2)

Insitu measurement of seepage velocity:

  • Two trial pits A & B
  • Dye inserted in A
  • Observe in t time in B

h= level diff. between A and B

i = h/AB

vs (seepage velocity) =AB/t

We know;

vs =ki/n

Therefore,

AB/t =(k*h)/(n*AB)

k = (AB2*n)/(t*h)

Permeability on layered deposit:

h= h1+h2

q= q1+q2

q = kz * A * h/(h1+h2)

= k1*A*h1/h1

=k2*A*h2/h2

Therefore,

k =(h1+h2)/{(h1/k1)+(h2/k2)}

In direction of bedding;

i = i1 =i2

q = q1+q2

A*kx*i = A*k1*i + A*k2*i

k = (k1*h1+k2*h2)/(h1+h2)

The post SOIL MECHANICS: Permeability, Determination of Coefficient of Permeability, Lab Method & Field Method, Confined & Unconfined Aquifer appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/20/soil-mechanics-permeability-determination-of-coefficient-of-permeability-lab-method-field-method-confined-unconfined-aquifer/feed/ 0
Paintings: types of paints, specifications for various types of painting, Whitewash, Distemper, Cement Paint, Enamel, Chapra Polish https://onlineengineeringnotes.com/2022/07/16/paintings-types-of-paints-specifications-for-various-types-of-painting-whitewash-distemper-cement-paint-enamel-chapra-polish/ https://onlineengineeringnotes.com/2022/07/16/paintings-types-of-paints-specifications-for-various-types-of-painting-whitewash-distemper-cement-paint-enamel-chapra-polish/#respond Sat, 16 Jul 2022 07:33:42 +0000 https://onlineengineeringnotes.com/?p=1263 Paint is a fluid, paste or spray prepared by dissolving a base into a vehicle with or without pigment. White Wash Preparation of lime wash: Lime wash shall be prepared from pure fat lime. i.e., fresh stone white lime. The lime shall be thoroughly slaked with water on the spot and stirred to make thin ... Read more

The post Paintings: types of paints, specifications for various types of painting, Whitewash, Distemper, Cement Paint, Enamel, Chapra Polish appeared first on OnlineEngineeringNotes.

]]>
Paint is a fluid, paste or spray prepared by dissolving a base into a vehicle with or without pigment.

White Wash

Preparation of lime wash:

  • Lime wash shall be prepared from pure fat lime. i.e., fresh stone white lime.
  • The lime shall be thoroughly slaked with water on the spot and stirred to make thin cream (app. Add 1 kg of lime to the 5 Liters of water)
  • Allowed to stand for a period of 24 hours and then s screened through a clean coarse cloth.
  • For 10 Cubic decimeters of the cream, add 40 grams of gum.
  • Indigo (Neel) up to 3 grams per kg of lime dissolved in water shall then be added and stirred well.

Preparation of surface:

– For new work; the surface shall be thoroughly brushed free from mortar droppings and foreign matter.

–  For old work; all loose particles and scales shall be scrapped off and holes in plaster, as well as patches of less than 50 cm2 area, shall be filled up with mortar of the same mix.

– If any efflorescence is observed on the surfaces, the deposits should be brushed, clean, and washed.

– The surface shall then be allowed to dry for at least 48 hours before whitewashing is done.

Application:

  • The whitewash shall be applied with moon brushes to the specified number of coats.
  • The operation for each coat shall consist of a strike of the brush given from the top to downwards and another from the bottom to upwards, and similarly from left to right and right to left horizontally constitutes a coat.
  • Wait until the previously applied coat is dried for the next coat.
  • 3 or more coats for newly plastered surfaces for obtaining a smooth and uniform finish.
  • For old work; after the surface has been prepared, a coat of whitewash shall be applied over the patches and repairs, then a single coat or two or more coats of whitewash as stipulated should be applied to present a uniform finish through which the plaster patches do not appear.
  • No signs of cracking and peeling over the dried surface.
  • The washing on the ceiling should be done prior to that on the walls.

Protection measures:

  • Doors, windows, floors, articles of furniture, etc., and such other parts of the building not to be whitewashed, shall be protected from being splashed upon.
  • Splashing and dropping, if any shall be removed by the contractor at his own cost and the surfaces cleaned.
  • Damages if any to furniture and fixtures shall be recoverable from the contractor.

Distemper Work

Preparation of paint:

  • The washable distemper powder shall be stirred slowly in clean water using 0.6 liters of water per kg of distemper or as specified by the manufacturer.
  • Warm water is preferably be used.
  • It shall be allowed to stand for at least 30 minutes (or if practicable overnight) before using.
  • Frequently stirred and shaken before and during use to obtain even consistency.
  • Only a sufficient quantity of Distemper shall be mixed for an actual one day’s work.

Preparation of surface:

  • Surfaces should be thoroughly brushed or sandpapered smooth and made free from loose mortar and foreign particles before distempering.
  • Pitting in plaster shall be made good with Plaster of Paris mixed with color to be used.
  • The surface shall then be rubbed down again with fine grade sand/paper and made smooth.
  • Single Coat distemper shall be applied initially over the patches.

Application:

  • For new work, the treatment shall consist of a priming coat of whiting followed by the application of two or more coats of distemper till the surface shows an even color.
  • Plastered surface/POP surface should be properly cleaned with hot water-based primer and rectification of defects in plaster/POP surface with broken edges shall be done by using a proper color putty paste as per manufacturer’s specifications.
  • With proper distemper brushes in horizontal strokes followed by immediate vertical ones, known as one coat.
  • The subsequent coats shall be applied only after the previous coat has dried.
  • The finished surface shall be mixed to finish one room at a time.
  • The application of a coat in each room shall be finished in a single operation & no work shall be started in any room, which cannot be completed on the same day.
  • The brushes shall be washed with hot water and hung down to dry after completion of each day’s work. Old brushes should not be used. t be used.

Waterproof Cement Paint Work

Preparation of paint:

  • Only fresh paint shall be used, hard or set paint shall not be used.
  • The container, which must be stored in a dry place shall be made loose by rolling and shaking the container before opening
  • Cement paint shall be mixed with water in two stages first by mixing 2 parts of paint with 2 parts of water by volume to have a uniform solution.
  • Gradually add the cement paint to the water and not vice-versa.
  • Further add 1 part of water to the mix and stirred properly to obtain workable, uniform, and consistent liquid as per the manufacturer’s specifications.
  • Enough and minimum quantities of cement paint mixed to be used within 1 hour, otherwise it sets.
  • The lids of cement paint shall be kept tightly closed when not in use, as by exposure to the atmosphere the cement paint rapidly becomes air set due to hygroscopic qualities.

Preparation of surfaces:

  • Before the application of paints, all duct, and foreign materials shall be removed from the surface by use of a wire brush.
  • All holes, cracks, and abrasions shall be filled with plaster of Paris, properly prepared and applied, and smoothed off to match adjoining surfaces.
  • Any loose or uneven areas of any major cracks or defects in the concrete or plaster background shall be cut out and made good and the repairs allowed to dry thoroughly.
  • Efflorescence if seen, removed by dry brushing.

Application:

  • The freshly mixed paint shall be frequently stirred during application and no mixture (paint) shall be used after an hour. Of mixing
  • A vertical stroke with another horizontal stroke comprises one coat.
  • Paint solution shall be applied to the surface with a hairbrush/roller in a number of coats to get a uniform finish.
  • After the first coat of the paint has hardened, it shall be cured with water at least 24 hours before the second coat is applied.
  • Similarly, the required number of coats shall be given to get an even and uniform shade.
  • Left and keep damp for 7 days.
  • The final painted surface shall exhibit a uniform and good finish appearance.

Enamel Paint

Application of paint:

  • The primer and paint shall be of approved quality and of approved manufacturers like Asian paints, Nerolac, Jensolin, Berger British Paints, Jhonson, and Nicholson or equivalent brand approved by the engineer.
  • These materials shall be ready mixed and in sealed tins with the manufactures name, color and instruction clearly painted in the container.

Preparation of surfaces:

  • All surfaces to be painted shall be planned and thoroughly sandpapered, first by using N0. 120 Sand Paper.
  • Ordinary putting shall fill up nail’s holes, cracks, or other inequalities.
  • Putting shall be made up of 2 parts of best quality whiting (absolutely DEAD STONE LIME), 1 part of white lead mixed together in linseed oil and kneaded (3 oz. of linseed oil to 1 lb. of whiting).
  • A primer coat shall be locally applied before putty in holes, cracks, etc.
  • The putty/paste fillers shall be of approved quality and shall be applied to the surfaces with a knife or other sharp-edged tools after the priming coat as well as after each undercoat.
  • After the surface is dry, it shall be sandpapered by using No. 60 sandpaper.
  • Surfaces so prepared shall be painted with one coat of primer. The primed surface when dry shall be sandpapered by using No. 100 Sandpaper.
  • The primed surface so prepared shall be painted with one coat of selected enamel using a bristle brush. The paint shall be applied in the thinnest possible layers with parallel strokes.
  • Care shall be taken to ensure the surfaces are free from dust and other foreign material before priming or enameling the surfaces.
  • No paint shall splash on the floor, walls, jambs, sill, or other parts of buildings.

Application:

On Wood Work:

  • After preparing and after the priming coat has been applied, the top coat shall be applied.
  • The primed surface so prepared shall be painted with one coat of selected enamel using a bristle brush and not horse hair ones.
  • The paint shall be applied in the thinnest possible layers with parallel drawings, no flowing down shall not be allowed.
  • Spray Paintings for the false ceiling and acoustic materials such as thermo cole, perforated acoustic tile, soft board, etc.
  • The engineer prior to commencement of work shall approve a sample of workmanship.

On Metal Surfaces:

  • The paint shall be continuously stirred in the containers so that its consistency is kept uniform throughout.
  • The painting shall be laid on smoothly by means of crossing and laying off.
  • The crossing & laying off consists of covering the area with paints, brushing the surface hard for the first time, and then brushing alternatively in opposite directions, two or three times, and then finally brushing lightly in a direction at right angles to the same.
  • The full process of crossing and laying off will constitute one coat and no brush marks shall be left after the laying off is finished.
  • Paints used shall be brought to the required consistency by adding suitable thinner.
  • Surface to be painted shall be clean, dry, smooth, and adequately protected from dampness.
  • Each coat shall be applied in sufficient quantity to obtain complete coverages, shall be well brushed and evenly worked out over the entire surfaces and into all corners, angles, and cervices, and allowed to dry thoroughly.
  • Second coat shall be a suitable shade to match the final color.
  • Allow at least 48 hours of drying time between coats for interior and 7 days for exterior work.
  • Finished surfaces shall be protected from dampness and dust until completely dry and shall be uniform, of approved color, smooth and free from defective brushing and clogging.
  •  Edges of paints adjoining other materials or colors shall be made sharp and clean without any overlapping.

(e) Chapra Polish

Preparation of Polish:

  • The Chapra polish shall be made by mixing Chapra granules, thinner, and spirit.
  • The chapra should completely dissolve in the spirit and the thinner should be used to obtain the required consistency.

Preparation of surfaces:

  • Before application of Chapra polish, the timber surface shall be thoroughly sandpapered to obtain a smooth surface and all the dust shall be removed from the surface.
  • A coat of primer of chalk powder mixed with resin or ready-made approved putty shall be applied and sandpapered to fill in the voids and joints.

Application:

  • Over the primed surfaces, the Chapra polish of approved quality shall be applied with smooth cotton cloth with firm rubbing and spread evenly.
  • Use good quality and perfectly clean cloth.
  • Chapra wood finish shall be reapplied at least three times, after sand papering with fine sand paper to get the final finish and best result.

The post Paintings: types of paints, specifications for various types of painting, Whitewash, Distemper, Cement Paint, Enamel, Chapra Polish appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/16/paintings-types-of-paints-specifications-for-various-types-of-painting-whitewash-distemper-cement-paint-enamel-chapra-polish/feed/ 0
Shear Strength of Soils https://onlineengineeringnotes.com/2022/07/15/shear-strength-of-soils/ https://onlineengineeringnotes.com/2022/07/15/shear-strength-of-soils/#respond Fri, 15 Jul 2022 06:18:12 +0000 https://onlineengineeringnotes.com/?p=1249 Shear Strength of Soils: Shear strength of soil is the resistance to deformation by continuous shear displacement of soil particles by the action of shear stresses. Shear stresses > Shear Strength, failure takes place Failure may be sinking of footing or movement of a wedge of soil behind a retaining wall forcing it to move ... Read more

The post Shear Strength of Soils appeared first on OnlineEngineeringNotes.

]]>
Shear Strength of Soils:

Shear strength of soil is the resistance to deformation by continuous shear displacement of soil particles by the action of shear stresses.

Shear stresses > Shear Strength, failure takes place

  • Failure may be sinking of footing or movement of a wedge of soil behind a retaining wall forcing it to move or slide.
  • Shear strength is due to friction between particles, interlocking, and cohesion.
  • Principal plane – shear stress = 0
  • Normal stresses acting on Principal Planes are called Principal Stresses.
  • Critical stress values and Obliquities generally occur on major and minor principal planes (two-dimensional solution)

Mohr-Coulomb failure theory:

Coulomb – 1776

Mohr – 1900 (extended Coulomb’s theory)

The theory states that:

  1. Materials essentially fail in shear. the critical shear stress causing shear failure depends upon the properties of the material as well as normal stress on the failure plane.
  2. The shear strength is equal to shear stress at failure on a potential plane.
  3. In a material subjected to three-dimensional principal stress (Ϭ1, Ϭ2, and Ϭ3), the intermediate principal stress Ϭ2 doesn’t have any influence on the strength of the material.

Mathematically,

τ = f(Ϭ)

τ = shear stress

Ϭ= normal stress

MOHR’S STRESS CIRCLE 

Fig : Element of Soil

Ϭ – Normal stress

τ -Shear stress

Ϭ1- major principal plane

Ϭ3- minor principal plane

α = Inclination to major plane

Resolving the forces horizontally;

Ϭ3*BC = Ϭ*AC Sinα – τ *AC Cosα

Vertically;

Ϭ1*AB = Ϭ*AC Cosα + τ *AC Sinα

Dividing both sides by AC;

Ϭ3*Sinα = Ϭ*Sinα – τ *Cosα – (i)

And,

Ϭ1*Cosα = Ϭ* Cosα + τ *Sinα- (ii)

Multiplying (i) by Cosα and (ii) by Sinα and subtracting (i) from (ii)

Cosα*Sinα (Ϭ1-Ϭ3) = τ (Sin2α + Cos2α)

Therefore,

τ = {(Ϭ1-Ϭ2)Sinα}/2 – (iii)

Substituting τ in eqn (i)

Ϭ3 Sinα = Ϭ Sinα – {(Ϭ1-Ϭ3)*Sin2α*Cosα}/2

Or, Ϭ3 = Ϭ – {(Ϭ1-Ϭ3)*2Cos2α}/2

Or, Ϭ3 = Ϭ – (Ϭ1-Ϭ3)*Cos2α

Or, Ϭ = Ϭ3 + (Ϭ1-Ϭ3)* Cos2α

Or, Ϭ = Ϭ3 + (Ϭ1-Ϭ3)* {(1+Cos2α)/2}

           = Ϭ3 + {(Ϭ1-Ϭ3)/2} + {(Ϭ1-Ϭ3)/2} *Cos2α

Therefore,

Ϭ = {(Ϭ1+Ϭ3)/2} + {(Ϭ1-Ϭ3)/2} *Cos2α – (iv)

MOHR’S CIRCLE

Fig : Mohr Circle

Values of Ϭ, τ for α are plotted, locus of all the points gives a circle known as Mohr Circle

OE – Normal Stress (inclined at α)

ED – Shear Stress (inclined at α)

A – Minor Principal Stress

B – Major Principal Stress

These plane intersects at A (pole)

Principle Planes inclined to the Co-ordinate Axis :

Fig: Inclined Soil Element & Mohr Circle

Draw MN//BP (P = Pole) (Major Plane)

                   Similarly NO//AP           (Minor Plane)

                   OM//P’P  (P’ = Pole of inclined Plane)

                   P’X = τ; OX = Ϭn   (for inclined)

Angle of Obliquity:

R = Resultant of Ϭ & τ
Angle made by resultant to the Plane = θ (angle of Obliquity)
 
 θ= Ф (tangent to circle) (failure envelope)
Ф = internal frictional angle

Relation between Ф and α :

Coulomb failure criterion:

Τf = C + Ϭnf * tanФ (linear function)

Mohr failure criterion :

Τf = f (Ϭnf)  (Unique function)

Mohr-Coulomb failure Criterion :

θ= 45 + Ф/2

References:

  1. Terzaghi, Karl, Peck, R.B & John, Wiley (1969) Soil mechanics in engineering practice, New York.
  2. Arora , K.R (2008), Soil mechanics and foundation engineering, Delhi: Standard Publisher Distribution

The post Shear Strength of Soils appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/15/shear-strength-of-soils/feed/ 0
Concrete Technology: Cement, Aggregate, Water (W/C, Workability), Admixtures https://onlineengineeringnotes.com/2022/07/14/concrete-technology-cement-aggregate-water-w-c-workability-admixtures/ https://onlineengineeringnotes.com/2022/07/14/concrete-technology-cement-aggregate-water-w-c-workability-admixtures/#respond Thu, 14 Jul 2022 04:54:10 +0000 https://onlineengineeringnotes.com/?p=1240 Concrete Artificially built-up Stone with Cement, Water, Aggregates with or without Admixtures Constituents of Concrete: Aggregates = (60-70) % Water = (7- 15) % Cement = (14-21) % Air = (0 – 3) % Properties of Concrete: Air Content Fluidity Strength Setting Time Durability Types of Concrete: Based on Binding Materials Cement Concrete Lime Concrete ... Read more

The post Concrete Technology: Cement, Aggregate, Water (W/C, Workability), Admixtures appeared first on OnlineEngineeringNotes.

]]>

Concrete

  • Artificially built-up Stone with Cement, Water, Aggregates with or without Admixtures

Constituents of Concrete:

Aggregates = (60-70) %

Water = (7- 15) %

Cement = (14-21) %

Air = (0 – 3) %

Properties of Concrete:

  • Air Content
  • Fluidity
  • Strength
  • Setting Time
  • Durability

Types of Concrete:

  • Based on Binding Materials
  • Cement Concrete
  • Lime Concrete
  • Based on Design
  • Plain Concrete (no reinf.)
  • Reinforced Concrete
  • Prestressed Concrete (High Compressive Stress are artificially induced before use)
  • Based on Density
  • Light Weight Concrete (18 KN/M3) (i.e., by using pumice from volcanoes or bloated aggregates)
  • Normal Weight Concrete (24 KN/M3)
  • Heavy Weight Concrete (32 KN/M3)

Boated Aggregates?

  • Slightly Salted and lightly smoked

Cement

Composition of Cement Clinker:

Tricalcium Silicate (C3S) – 40%

  • Cement hydrates more rapidly
  • Generates more heat of hydration
  • Develops high early strength
  • Possesses less resistance to Sulphur Attack

Dicalcium Silicate (C2S) – 32 %

  • Cement hydrates slowly
  • Generates less heat of hydration
  • Provides good ultimate strength
  • More resistance to sulphate attack

Tricalcium Aluminate (C3A) – 10.5 %

  • Reacts fast with water
  • Generates a large amount of heat of hydration when reacts with water.
  • Causes initial setting of cement
  • First compound which reacts with water

Tetra Calcium Alumino Ferrite (C4AF) – 9 %

  • Poor cementing value
  • Reacts slowly with water
  • Generates small heat of hydration

Types of Cement:

Ordinary Portland Cement (OPC)

  • Common type of cement
  •  Resistance to dry shrinkage and cracking
  • Less resistance to chemical attack
  • Shouldn’t be used for construction work exposed to sulphate

Rapid hardening Portland Cement (RHPC)

  • High early strength cement
  • Lighter than OPC
  • Shouldn’t be used for massive concrete structures

Low Heat Portland Cement (LHPC)

  • Low percentage of tri-calcium silicate
  • High percentage of di-calcium silicate
  • Hydrates slowly
  • Less lime than OPC
  • Possesses less compressive strength
  • Widely used in retaining walls
  • Shouldn’t be used for thin concrete structures

Sulphate Resisting Portland Cement (SRPC)

  • Percentage of C3A kept below 5%
  •  Resisting power against sulphates
  • Used for structures subjected to severe alkaline conditions such as canal linings, culverts, etc.

High Alumina Cement (HAC)

  • 35% of Alumina
  • Sets slowly
  • Obtained higher ultimate strength in a short period of time.
  • Used for structure subjected to the action of Sea water, chemical plants and furnaces.

Blast Furnace Slag Cement (BFSC)

  • Made by intergrading of OPC clinker and granulated blast furnace slag.
  • Cheaper than OPC
  • Develops low heat of hydration
  • Has less early strength
  • Frequently used in dams, abutments, and retaining walls.

Colored Cement (CC)

  •  prepared by adding (5-15) % of a suitable coloring pigment before the Cement is finally ground.
  • Commercial term used is colocrete.
  • Used for the finishing of floors, external surfaces, decorative concrete, aesthetics, etc.

Portland Pozzolana Cement (PPC)

Made by intergrinding of OPC clinker and pozzolana

  • Pozzolana Materials are a silicious material containing clay up to 80%.
  • 30% of Pozzolana added to OPC
  • Used for hydraulic structures as dams, weirs

Aggregates

Aggregates = Boulder (> 200 mm)

                        Cobble (80 – 200 )mm

Properties of Aggregate:

  • Strong
  • Chemically inert
  • Hard
  • Durable

Types of Aggregates:

  • Natural Aggregates = sand, gravel, crushed stone, crushed rock etc.
  • Artificial aggregates = furnace clinker, coke – breeze, saw dust, foamed slag

(A) Based on size

(i) Fine Aggregates (0.075 – 4.75) mm

                              (0.002 – 0.06) mm – silt

                              < 0.002 mm – clay

(ii)Coarse Aggregates: (4.75 – 75) mm

Max. size of Coarse < (1/4) * min. dia. of PCC

                                    < (1/5) * min. dia. of RCC

(iii) Cyclopean Aggregates: (> 75 mm)

(iv) All- in Aggregates:

  • Consists of different fractions of fine & coarse aggregates
  • Not used as an aggregate for making high-quality concrete.

Based on type of Rock

  • Aggregates from Igneous Rock
  • Aggregates from Sedimentary Rock
  • Aggregates from Metamorphic Rock

Based on Strength

  • Hard Aggregates
  • Soft Aggregates

Based on Shape

  • Rounded (33 % void, good workability, low strength due to poor interlocking)
  • Flaky (least diameter < 0.6 mean diameter)
  • Elongated (Greater diameter > 1.8 mean diameter)
  • Angular ((38 – 45) % void, less workability, high strength due to best interlocking)
  • Irregular ((35 – 37) % void, low workability, average strength due to average interlocking)

Based on Surface Texture

  • Glassy
  • Smooth
  • Granular
  • Rough
  • Crystalline
  • Honey combed
  • Porous

Based on surface moisture

  • Very Very Dry
  • Dry
  • Saturated Surface Dry
  • Wet or Moist

Properties of Aggregates:

Crushing Value:

  • It is the value which shows resistance of an aggregate to  the crushing under any gradually applied compressive load.

Impact value:

  • Resistance to sudden shock/impact
  • Used as alternative to crushing value
  • Know quality of aggregates

Abrasion Value:

  • Resistance to wear
  • Rotated in cylinder with some abrasive charges
  • By Los-Angeles machine

Soundness :

  • Resistance to effect of hydration of cement & weather

Water

  • Insufficient water – harsh & unworkable concrete
  • Excess water – bleeding & segregation
  • Presence of CO3, HCO3of Na– adversely affect on the setting time of cement
  • Presence of CaCl2 -accelerates setting & hardening of Cement (restricted to 1.5% by wt. of Cement)

W/C Ratio: (Experiment by Duffs Abrahms known as w/c ratio law)

  • Law is valid only when concrete is of workable plasticity
  • Strength depends on w/c and not on C/A ratio
  • Strength  1/(w/c)
  • w/c < 0.45: – concrete is not workable/honey combed

Workability:

  • ease and homogeneity in mixing, placing, compacting, finishing

Factors affecting Workability:

Water Content

  • Increases with water content

Size of Aggregates

  • Large size aggregates more workable than small size

Shape of Aggregates

  • Round shape more workable than flaky, angular & elongated

Surface texture of Aggregates

  • Smooth texture more workable than rough

Grading of Aggregates

  • Continuous lean concrete mix more workable

Air entraining Agents

  • Increases the workability (bubbles produced)

Temperature

  • Reduces at high temperature

Admixtures

Admixtures are used for accelerating or retarding initial set and strength, can be positive or negative, either chemical or mineral.

  • Air- entraining Admixtures, Retarding and Water reducing Admixtures, Accelerating Admixtures, Water Proofing Admixtures, Pozzolanic Admixtures, Coloring/Pigment Admixtures

The post Concrete Technology: Cement, Aggregate, Water (W/C, Workability), Admixtures appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/14/concrete-technology-cement-aggregate-water-w-c-workability-admixtures/feed/ 0
Building materials: Properties of Building Materials; Types of Building Materials:  Stones & Bricks https://onlineengineeringnotes.com/2022/07/13/https-onlineengineeringnotes-com-category-engineering-geology/ https://onlineengineeringnotes.com/2022/07/13/https-onlineengineeringnotes-com-category-engineering-geology/#respond Wed, 13 Jul 2022 04:38:22 +0000 https://onlineengineeringnotes.com/?p=1234 Properties of Building Materials Physical Properties: Identified by visual observation & Hand tools Chemical Properties: Identified based on the effect of different chemicals Thermal Properties: Effect of Heat Types of Building Materials Stone Stone is the naturally available construction material and is obtained from a quarry, process of extracting stones by excavating, wedging, heating & ... Read more

The post Building materials: Properties of Building Materials; Types of Building Materials:  Stones & Bricks appeared first on OnlineEngineeringNotes.

]]>
Properties of Building Materials

Physical Properties: Identified by visual observation & Hand tools

Chemical Properties: Identified based on the effect of different chemicals

Thermal Properties: Effect of Heat

Types of Building Materials

Stone

Stone is the naturally available construction material and is obtained from a quarry, process of extracting stones by excavating, wedging, heating & blasting is called quarrying and is composed of different minerals and with different processes.

Classification of stones:

Geological Classification:
Igneous Rocks
  • Solidification of molten mass above or below the earth’s surface.
  • Crystalline glossy or fussed texture
  • Ex: – Granite, Basalt, Diorite, Trap dolerite, Syenite, Pegmatite, Gabbro etc.
Sedimentary Rocks
  • Gradually deposition of sand, clay, debris, etc. by the action of rain, wind, sun etc.
  • Stratified
  • Ex: – limestone and sandstone, conglomerate, gypsum, dolomite, magnesite, chalk, shale, kankar,Tripoli, diatomite, etc.
Metamorphic Rocks
  • Change in texture or mineral composition of rocks under heat and excessive pressure
  • Ex: – marble, Gneiss, Quartzite, Slate, Schist, etc.
Physical classification:
Stratified Rocks:
  • Distinct layers which can be separated
  • E.g.: limestone, slate, and sandstone.
Unstratified Rocks:
  • No sign of strata
  • E.g.: granite, marble, etc.
Chemical classification:
Silicious Rocks
  • Silica as the main constituents
  • E.g.: granite, quartzite, gneiss etc.
Argillaceous Rocks
  • Clay or Alumina as main constituents
  • E.g. of silicious rock: slate, laterite, kaolin, etc.
Calcareous Rocks
  • Lime or calcium
  • E.g.: limestone, marble, etc.

Important building stones:

1. Granite

  • mainly composed of quartz, felspar, mica

What is Feldspar?

“Feldspar is no other than silicate of aluminum with varying amounts of potash, soda, or lime.

  • Sp. Gravity -= 2.64
  • Compressive strength = 70 – 130 MN/m2
  • color depends on felspar – brown, grey, green, pink
  • Offer high resistance to weathering
  • Easily polished and worked
  • Used for the external facing of buildings

2. Slate

  • Argillaceous rock
  • Alumina + sand /carbonate of lime
  • Sp. Gravity = 2.8
  • Compressive strength = 60-7- MN/m2
  • Grey/dark blue color
  • Hard, tough, fine-grained
  • Used in cisterns
  • Slate as tiles, an excellent roof covering material.

3. Gneiss

  • Gneiss:
  • A silicious rock
  • Composed of quartz and felspar
  • More easily worked than granite
  • Used for street paving

4. Sandstone

  • Silicious sedimentary rock.
  • Composed of quartz, lime, and silica
  • Sp. Gravity = 2.65- 2.9
  • Compressive strength = 35 -40 MN/m2
  • White, grey, brown, pink, etc.
  • Strong and durable
  • Used for ashlar works, moldings, carvings, etc.

5. Limestone

  • Sedimentary rock of calcareous variety
  • Sp. Gravity = 2.6
  • Brown, yellow, dark grey colors
  • Used large quantities in blast furnaces
  • Used as stone masonry for walls.

6. Marble

  • Metamorphic rock of calcareous variety
  • Sp. Gravity = 2.7
  • Very hard, ornamental work, takes a fine polish
  • Carving, decoration
  • Kankar
  • Impure limestone containing 30 % alumina & silica
  • Used for foundations of buildings

7. Laterite

  • Laterite contains a high percentage of iron oxide.
  • Porous and cellular structure
  • Sp. Gravity = 2 -2.2
  • Laterite blocks are suitable for light roads, and inferior buildings.
  •  a very good road metal

8. Moorum

  • Decomposed laterite
  • Deep brown or red color
  • Used in  garden walks & paths

9. Quartzite

  • Siliceous sandstones
  • Strong, durable, used as road metal/ railway ballast

Bricks

Bricks are construction materials made by moulding the tempered clay to a suitable shape and size which is in a plastic condition, dried in sun, and burnt in a kiln or clamp.

Brick clay contains (20-30) % Alumina

                                  (50-70) % Silica

Other constituents are lime, magnesia, sodium, potassium, manganese, and Iron oxide.

Excess of Alumina,Silica & Lime

Alumina – brick crack/warp on drying

Silica – brick brittle and weak

Lime –  brick to melt and distort during burning

Alkaline salt – efflorescence

Manufacture of Bricks:

Preparation of Brick clay
  • Earth left for atmospheric action for a few weeks after digging called weathering.
  • 1.5 – 2.5 m3 of brick soil – 1000 bricks
  • Tempered in pug mills
  • Process of mixing clay, water, and other ingredients is known as Kneading.
Moulding bricks:
  • Handmade bricks superior to machine-made bricks
  • Drying of Bricks:
  • Bricks are arranged in rows on their edges on a slightly raised ground called hacks.
  • Burning of bricks:
  • Clamp burning = 60 % out-turn
  • Kiln burning = 80 – 90 % out-turn
  • Takes 24 hrs. at 1000 – 1200 0c.
  • Cool for 12 days

Classification of Bricks:

1. First Class:
  • Well burnt, smooth, even surface, rectangular, uniform reddish.
  • Water absorption (≤ 20 %) at 24 hrs.
  • Min. crushing strength = 10.5 MN/m2
2. Second Class:
  • Slightly overburnt, rough, no perfect rectangle
  • Water absorption (≤ 22 %)
3. Third Class:
  • Under burnt, soft, easily broken
  • Water absorption (≤ 25 %)
4. Jhama bricks
  • Over burnt, irregular, dark bluish color

What is the size of the Brick?

  •  Size of Brick = (19 cm * 9 cm * 4 cm)

                          Or (19 cm * 9 cm * 9 cm)

  • Sp. Gravity = 2
  • For 1 m3 of brick masonry = 550 machine-made bricks

                                                  500 handmade bricks

Special Bricks:

Squint bricks: construction of acute and obtuse squint quoins

Paving bricks: used for street pavements

Round bricks: circular pillars

Perforated & Hollow: Partitions walls

Refractory Bricks: withstanding temperature, low Coeff. of expansion & contraction.

  • Acid Bricks: (fire Bricks & silica bricks)
  • Basic Bricks: ( Dolomite bricks, Magnesite bricks and bauxite bricks)
  • Neutral Bricks: (Chrome bricks, chrome-magnesite Bricks, spinel Bricks)


The post Building materials: Properties of Building Materials; Types of Building Materials:  Stones & Bricks appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/13/https-onlineengineeringnotes-com-category-engineering-geology/feed/ 0
Pre-fabrication: Principles of pre-fabrication, advantages, and disadvantages of pre-fabricated buildings https://onlineengineeringnotes.com/2022/07/12/pre-fabrication-principles-of-pre-fabrication-advantages-and-disadvantages-of-pre-fabricated-buildings/ https://onlineengineeringnotes.com/2022/07/12/pre-fabrication-principles-of-pre-fabrication-advantages-and-disadvantages-of-pre-fabricated-buildings/#respond Tue, 12 Jul 2022 04:16:08 +0000 https://onlineengineeringnotes.com/?p=1231 Pre-fabrication Pre-fabrication is the practice of assembling the components of a building other than the building sites, i.e., in the factory or a manufacturing site, and transporting either complete assemble or semi-assembled to the construction site where the structure is located. This method controls the construction cost by economizing the wages, time, and materials. The ... Read more

The post Pre-fabrication: Principles of pre-fabrication, advantages, and disadvantages of pre-fabricated buildings appeared first on OnlineEngineeringNotes.

]]>

Pre-fabrication

Pre-fabrication is the practice of assembling the components of a building other than the building sites, i.e., in the factory or a manufacturing site, and transporting either complete assemble or semi-assembled to the construction site where the structure is located.

This method controls the construction cost by economizing the wages, time, and materials.

The pre-fabrication is done in two stages

  1. Manufacturing under factory conditions
  2. Erection of structures at locations

Broadly stages are classified as:

  1. Casting
  2. Curing
  3. Transportation and erecting

Advantages:

  • The need for formwork, scaffolding & shuttering is reduced.
  • Construction time is reduced.
  • Quality control is easier in a factory than on a construction site.
  • Congestion in the site is minimized.
  • Time spent due to bad weather at the construction site is minimized.
  • Less wastage.

Disadvantages:

  •  Great attention is required while joining the pre-fabricated section to avoid joint failure.
  • Leakage from the joint is possible if not properly jointed.
  • High transportation cost is required for the transportation of bulky & voluminous sections.
  • If the prefabricated section is heavy then a crane is required at the site.
  • Local jobs are lost
  • Can’t hide cable wiring, it can be expensive.

Commonly used pre-fab material in Nepal:

Fiber cement Board:

  • These are the sandwich panel of two fiber-reinforced cement sheets enclosing a lightweight core composed of Portland cement, binder, and aggregate.
  • The panel has a tongue & groove joining system that facilitates rapid construction with minimum effort.
  • The board has a low water absorption rate.
  • Thickness 50 to 75 mm, width 2’ & height varies from 8’ to 10’.

PUF Panel

  • PUF panel consists of the prefabricated sandwich panel made of GI sheet and polyurethane between them.
  • The PUF panel are interlocked with each other by a cam lock system or through a tongue & groove arrangement.
  • PUF is generally used for roofs & it is the newest type of roofing panel.
  •  It has a beautiful appearance.
  • PUF panel are available in standard width of 1 m and various thickness 50,60,80,120,150 & 200 mm.

Rockwool Panel

  • Rockwool panel consists of a prefabricated sandwich panel of GI sheet on both sides.
  • Insulation against sound in this type of panel is remarkable.
  • They are used in wall.

EPS Panel

  • EPS panel is made by using thermocol/expanded polystyrene covered by a metal sheet on both sides.
  • Expanded polystyrene (EPS) is a lightweight cellular paper material consisting of a small hollow spherical ball.
  • EPS panel requires light installation & has a short construction period.
  • It is low cost, can bear a high load, is moisture-proof, sound-insulating & heat insulating.

Visually there are not a lot of differences between a prefab house and a house made of bricks & stones. pre-fab buildings look the same as any ordinary houses.

Prefab houses are comfortable, portable, and durable in the long run.

The beauty of prefab houses is that they take far less time to build than concrete houses. The prefab materials required to build the house are manufactured at the factory and then assembled at the site.

  • The material used to construct walls in a prefab house are lighter than bricks.so, living in an earthquake-prone zone with fears of our own house crumbling down on us, a prefab house should do little damage.
  • People have this misconception that prefab houses are only temporary when actually the prefab house is an excellent permanent alternative to the traditional house we have.
  • Prefab houses are also certified fireproofs, waterproofs, weatherproofs & earthquake resistant.

The drawbacks: –

  •  once the house is installed it can’t be painted over or plastered with the wallpaper of your choice.
  • Also, because it’s a thin wall, the wiring inside the house can’t be hidden.
  • Another drawback of a prefab house is the money factor, it can be fairly expensive, and a lot of materials have to be imported thus resulting in a high price.
  • With prefab s house with 3- bedroom, total 5 room can take one to the half-month of construction.
  • The initial construction phase is similar to that of a concrete house, it has a foundation & strong steel structure, the only difference is instead of bricks prefabs are installed in the wall.
  • Price per square foot is from Rs 2000 to 3500.

Advantages:

  • Safe
  • Earthquake proof
  • Fire proof
  • Weather proof
  • Quick assembly
  • Durable & potable
  • Short construction period

The post Pre-fabrication: Principles of pre-fabrication, advantages, and disadvantages of pre-fabricated buildings appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/07/12/pre-fabrication-principles-of-pre-fabrication-advantages-and-disadvantages-of-pre-fabricated-buildings/feed/ 0
Reinforced concrete structures: Working Stress Method & Limit State Method https://onlineengineeringnotes.com/2022/06/13/reinforced-concrete-structures-working-stress-method-limit-state-method/ https://onlineengineeringnotes.com/2022/06/13/reinforced-concrete-structures-working-stress-method-limit-state-method/#respond Mon, 13 Jun 2022 17:33:36 +0000 https://onlineengineeringnotes.com/?p=1218 Reinforced concrete structures During the bending of simply supported structures, the upper portion is subjected to compressive stresses, while the lower portion is subjected to tensile stresses. The permissible tensile stress in concrete is about one-tenth of the permissible compressive stress, therefore the tensile stresses in the structure are taken care of by the steel. ... Read more

The post Reinforced concrete structures: Working Stress Method & Limit State Method appeared first on OnlineEngineeringNotes.

]]>
Reinforced concrete structures
  • During the bending of simply supported structures, the upper portion is subjected to compressive stresses, while the lower portion is subjected to tensile stresses.
  • The permissible tensile stress in concrete is about one-tenth of the permissible compressive stress, therefore the tensile stresses in the structure are taken care of by the steel.
  • Such a combination of concrete and steel is known as reinforced cement concrete (RCC) & structure is known as reinforced concrete structures.

Note: for the same cross-section of steel to that of concrete, tensile strength is 300 times, while compressive strength is 30 times that of concrete.

There are three types of steel reinforcement bars:

  • Mild steel and medium tensile steel bars
  • Deformed bars
  • Cold twisted bars

What are deformed bars?

Deformed bars have projection and check the slipping of bars, developing a great bond.

Note:

  1. when we used cold twisted bars instead of normal mild steel bars, it increased yield stress by about 50%. Hence save reinforcing material by 33%.
  2. The pitch of projection in the deformed bar is in the range of (90-120) mm.
  3. Size of bars = 5,6,8,10,12,16,20,22,25,32,36,40,45 and 50 mm.

Design methods of RCC structures:

Working Stress Method

  1. This method is known as a modular ratio or elastic method.
  2. Most popular and common method.
  3. The moment and forces acting on a structure are obtained from the actual values of service loads.
  4. The stresses in concrete and the reinforcing steel are restricted to only a fraction of their true strengths in order to provide an adequate factor of safety.

i.e., FOS (conc) = 3

        FOS (steel) =1.78-1.80

Limit State Method

  • This method is known as the plastic method.
  • It is designed to withstand safely all loads throughout its life.
  • It also satisfies serviceability requirements such as excessive deflections, cracking, vibrations, etc.

Ultimate Strength Method

  • This method is also known as the load factor method.
  • In this method true margin of safety is exactly known.
  • It is based upon results obtained from experiments depicting true behaviors of structures.

Working Stress Philosophy

  • Traditional method used for a reinforced concrete design where it is assumed that concrete is elastic, steel and concrete act together elastically and the relationship between loads & stresses is linear right up to the collapse of the structures.
  • The elastic theory assumes a linear variation of strain and stress from zero at the neutral axis to a maximum at the extreme fiber.
fig: working stress design

Assumptions:

  •  A section that is plane before bending remains plain after bending (Bernoulli’s Assumptions)
  • Within the elastic limit the bond between steel and concrete is perfect
  • The tensile strength of concrete is ignored.
  • The stress in concrete varies linearly from zero at its neutral axis and maximum at its extreme fiber. i.e., concrete is elastic.
  • The modular ratio ‘m’ has the value (280/cb) where cb is the permissible compressive stress in bending. its unit is N/mm2 or mpa.

Drawbacks:

  • Concrete is not actually elastic. The inelastic behavior of concrete is even shown in low stresses. i.e., the distribution of actual stress in concrete is not described by triangular shape.
  • Since the factor of safety is on the stresses under working loads, there is no way to account for different degrees of uncertainties associated with different types of loads. With elastic theory, it is impossible to determine the actual factor with respect to loads.
  • It is difficult for shrinkage and creeps’ effects by using the working stress method.

Limit state philosophy:

  • Limit state philosophy has originated from ultimate or plastic design.
  • The object of design is to achieve an acceptable probability that a structure will not become unserviceable in its lifetime for the use for which it is intended, i.e., it will not reach a limit state.
  • A structure with appropriate degrees of reliability should be able to withstand safely all loads and also satisfy the serviceability requirements, such as limitations on deflections and cracking.

The most important of these above limit states which must be examined in design are as follows:

Limit state of collapse:

  • The collapse limit states or ultimate limit states concern the safety of people and/or the safety of the structures
  • When collapse limit states violate, it implies failure in the sense that a clearly defined limit state of structural usefulness has been exceeded.
  • The ultimate limit state :
  • Flexure
  •  compression
  • Shear, and
  • Torsion

Limit states of serviceability:

  • The serviceability limit states concern the functioning of the structure or structural members under normal use, the comfort of people, or the appearance of the construction world.

The factors  and l called partial safety factors in the limit state concept of design of reinforced concrete structures.

fig: limit state design

References:

  1. Reinforced Concrete Limit State/ A.K. Jain
RCC structures: limit State of Design

The post Reinforced concrete structures: Working Stress Method & Limit State Method appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/06/13/reinforced-concrete-structures-working-stress-method-limit-state-method/feed/ 0
Project management & marketing ; Network Model: CPM,PERT https://onlineengineeringnotes.com/2022/06/11/project-management-marketing-network-model-cpmpert/ https://onlineengineeringnotes.com/2022/06/11/project-management-marketing-network-model-cpmpert/#respond Sat, 11 Jun 2022 07:47:10 +0000 https://onlineengineeringnotes.com/?p=1208 Project Management Project management is the application of knowledge and skills along with experiences and associated with various processes and methods to achieve specific project objectives within agreed parameters and according to project acceptance. It is constrained to a finite time scale and within budget. Project management also involves identifying and managing risks, careful resources ... Read more

The post Project management & marketing ; Network Model: CPM,PERT appeared first on OnlineEngineeringNotes.

]]>
Project Management

Project management is the application of knowledge and skills along with experiences and associated with various processes and methods to achieve specific project objectives within agreed parameters and according to project acceptance. It is constrained to a finite time scale and within budget.

Project management also involves identifying and managing risks, careful resources management, smart budgeting, and clear communications among different stakeholders and team networks.

The purpose is to plan and manage the project to the successful completion of its listed goals and deliverables.

What is marketing?

Marketing is a complete set of processes that involves researching, promoting, selling, and distributing products or services. i.e., marketing is not other than getting potential clients or customers interested in the products or services.

The project life cycle

The project life cycle is a time frame. It includes the steps required for managers to successfully manage a project from start to the finish.

It includes 5 phases

  • Initiating
  • Planning
  • Executing
  • Monitoring/controlling
  • closing

Setting project objectives & goals

Setting up project objectives means the clear, precise, and measurable steps needed for achieving the set goals. Objectives are very specific that typically have a time-bound schedule for completion.

Whereas goals are broad vision and direction and almost align with the company mission, vision, and culture.

For example:

Goals: Being a top-grossing company over the next 5 years

Objectives: Increasing sales by 5% p.a.

Goals are always SMART:

  • Specific
  • Measurable
  • Attainable
  • Relevant
  • Timely

Network model: CPM & PERT

CPM (Morgan R. Walker,1957)

In the Critical Path Method, networks, the whole project consists of a number of clearly recognizable jobs called activities.

The Critical Path Method (CPM) is a network technique to deal with large and complex projects.

Activities are usually the operations, which take time to carry out and on which resources are expended. It is used for a repetitive type of project, which take a fairly accurate estimate of time for completion of each activity can be made. This technique is useful to determine how best to reduce the time required to perform production, maintenance, and construction. It helps to minimize the direct and indirect costs of a project.

The main characteristics of CPM are:-

  1. CPM is activity-oriented.
  2. CPM times are related to cost.

Terms associated with CPM:

fig: A critical Path Network Diagram
  1. Critical Path

It is the longest path on a network that does not allow any delay. If any delay on the critical path brings a delay in the project. The activities lying on the critical path are known as critical activities.

  • Total project time/critical time

This is the total duration of time of all the activities falling on the critical path and gives the total project duration of the network.

  • Activity and Events

Activity consumes time and resources while the event is the instant of time. Activity is denoted by an arrow and event is denoted by a circle, triangle, etc.

The beginning and end of activities are the events.

  • Head & Tail Event

Head event represents the end of a project. i.e. it lies at the end of an arrow and is the last event of the project. therefore, there is only one head event.

The tail event represents the beginning of a project.it lies at the start of an arrow and is the first event of the project. Therefore, there is only one tail event.

  • Dual role event

All the intermediate events other than head and tail events become dual role events. Intermediate events will be at the head of the arrow or at the tail of the arrow hence these are called dual role events.

  • Non-critical activity

Activities that do not lie on the critical path are non-critical activities. The delay on non-critical activity can be permitted which does not delay the overall project.

  • Dummy activities

An activity on a network that neither consumes resources nor time is called a dummy activity. Also called redundant activities. It helps to maintain the logic of the network and is denoted by the dotted line.

Calculation of CPM Network

Rules: Forward & Backward Pass

While calculating the Earliest Expected Time/Earliest Finish time for the occurrence of an event, we started from the initial event and ended with the last event. This is called a forward pass.

EFT=TEi+tij

Where TEi =Earliest Start Time

For calculating the Latest allowable Time/Latest Start Time for the occurrence of an event, we started from the end event and arrived at the initial event. This is called backward pass.

LST=TLj-tij

Where TjL=Latest Finish Time

Types of float

Float means a certain range within which an activity’s start time or its finish time may fluctuate without affecting the completion time of the project.

  1. Total float

It is the difference between the Latest start time the and Earliest start time or the Latest finish time and the Earliest finish time.

  • Free float

It is the difference between the Earliest finish time and the Earliest start time for its successor activity. therefore, it affects proceeding activities.

Numerically, FF=TF-slack of head events

  • Independent float

It is the excess time available when proceeding activities finish as soon as possible and succeeding activities start as early as possible. It affects only particular activities.

Numerically, IF= FF-slack of a tail event

  • Interfering float

The difference between total float and free float is called Interfering float.

Numerically, If = TF-FF = slack of head event

Q. A project schedule has the following characteristics

Activity1-22-32-53-43-54-74-85-66-77-88-9
Time (day)34250053464
  1. Construct Network Diagram
  2. Compute the earliest event time and latest event time
  3. Determine the critical path and total project duration
  4. Compute the total and free float for each activity

Solution:

1.

 

2. Earliest Event Time

Forward Pass                                                                  

EFT=TFi + tij

          = EST + d

EFT = max (TiF + tij)

Backward Pass

LST = TjL – tij

       = LFT – d

LST = min (TjL – ti)

                              

3.

Critical Path : 1-2-3-5-6-7-8-9 (longest Duration Path)

 Total Project Duration = 3+4+0+3+4+6+4 = 24

4.

TF & FF (As above table)

PERT

The program evaluation and review technique is a project planning and controlling process for projects having uncertainties and is considered useful for research & development types of projects. For example, developing and launching a missile, installation of machinery, r & d of products, marketing & advertising.

It is a logical sequence of activities but the time required for each activity is not certain.

Therefore, there associated three times and the expected duration of an activity is the weighted average of the three-time estimates. Three types of time estimates used in PERT are:

  1. Optimistic time

The shortest possible time for the completion of activities if everything goes well as expected. It is denoted by to.

  • Pessimistic time

The longest possible time for completion of activity if everything goes wrong and is unexpected. It is denoted by tp.

  • Most likely time

The other time most likely to occur and is between optimistic time and pessimistic time is known as most likely time and is denoted by tl.

Expected/average time (te) = (to+tp+4tl)/6

Gantt Chart (Henry Gantt,1900)

This is a graphical representation of various activities involved in a project. It has two coordinates. The horizontal ordinates or bar represents the duration of time taken. The vertical abscissa represents different types of activities.

The bar is divided into two parts longitudinally. The top portion indicates the progress of activities and the bottom portion indicates the duration.

Gantt charrt is also known as a bar chart.

Milestone chart

Milestone charts are the modification of a bar chart. The key events are identified and arranged in chronological order but not in a logical sequence.

Each event is numbered and a keynote is provided with it.

The key events are known as milestones.

The post Project management & marketing ; Network Model: CPM,PERT appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/06/11/project-management-marketing-network-model-cpmpert/feed/ 0
QUALITY AND COST COMPARISON OF DIFFERENT BRANDS OF CEMENT AVAILABLE IN MARKET OF KATHMANDU VALLEY https://onlineengineeringnotes.com/2022/03/04/quality-and-cost-comparison-of-different-brands-of-cement-available-in-market-of-kathmandu-valley/ https://onlineengineeringnotes.com/2022/03/04/quality-and-cost-comparison-of-different-brands-of-cement-available-in-market-of-kathmandu-valley/#respond Fri, 04 Mar 2022 06:36:49 +0000 https://onlineengineeringnotes.com/?p=1095 CHAPTER 1 INTRODUCTION 1.1 Background  In the olden days, Nepal relied heavily on India for the supply of cement as there were no cement manufacturing industry in the country. Nepal’s first state owned cement manufacturing plant, Himal Cement Company Limited was established in 1967 A.D. After the massive earthquake that took place on 12th May ... Read more

The post QUALITY AND COST COMPARISON OF DIFFERENT BRANDS OF CEMENT AVAILABLE IN MARKET OF KATHMANDU VALLEY appeared first on OnlineEngineeringNotes.

]]>
CHAPTER 1

INTRODUCTION

1.1 Background

 In the olden days, Nepal relied heavily on India for the supply of cement as there were no cement manufacturing industry in the country. Nepal’s first state owned cement manufacturing plant, Himal Cement Company Limited was established in 1967 A.D. After the massive earthquake that took place on 12th May – 2015; Nepal has set new standards for the construction of buildings. In cities like – Kathmandu, Biratnagar, Dharan, Butwal, Bhairawa, etc. high rise buildings and commercial complexes are being built-up by following new standards set by the government authorities. Since, there are high numbers of occupants in these types of buildings, it is very important to keep the quality of construction in priority as well as the construction cost into consideration.

Based on recent trends of construction, cost effectiveness is one of the most focused competitive strategies of the industry. Cost effectiveness focuses on operation efficiency for reducing the cost while quality remain constant.

1.2  Statement of Problems

For concreting works, the price of cement is very expensive in comparison with sand and aggregates. Cement is a complex material if it is not taken proper care then, its quality gets deteriorate with time and even gets as wastage when it comes in contact with moisture. Wastage of cement alone can over run the cost of the project. Therefore, the cost of cement is an important factor to be analyzed for the cost effective construction of any project. Currently, in Nepal, there are numbers of cement manufacturers like – Ghorahi, Jagdamba, Hetauda, Udaypur cements, etc. All of these manufacturers are producing 43 grade cement and some are even producing 53 grade of cement. Hence, it is the major job of the professionals to decide based on the market competitiveness to ensure the quality of cement by conducting various tests needed and the cost analysis. A research highlighting the issues of the quality of cement and suitability of price has not been conducted on local level yet; so this study is focused to analyze the quality of the cement and for the suitability of the cement brand considering the cost. M, S, A and SA cements have been analyzed in terms of their quality and suitability considering the cost as these three cement brands are only in construction works.

Abbreviations
OPC – Ordinary
Portland Cement
S – Shivam Cement
SA – Sagarmatha Cement
A – Aagni
M – Mangala

1.3  Project Objectives

The overall objective of the study was to assess the cost effectiveness of the applied cement brand with following specific objectives:

  1. To compare the quality of cement and cost of different brands of cements.
  2. To compare the cost difference among the different cement brands and analyze the impact on the costs of construction.

CHAPTER 2

LITERATURE REVIEW

Cement is a powdery substance made by calcining lime and clay, mixed with water to form mortar or mixed with sand, gravel and water to make concrete.

For construction purpose the meaning of the cement is restricted to bonding materials used with stones, sand, bricks, building blocks etc.

Following are the various applications of cement

  • It is used in the cement mortar for masonry works, plastering, pointing etc.
  • It is used for making joints for pipes, drains etc.
  • It is used in concrete for laying floors, roofs and constructing beams, stairs, pillars etc.
  • It is employed for manufacturing precast pipes, piles, fencing posts etc.
  • It is used in construction of important engineering structures such as bridges, dams, tunnels, light houses etc.
  • It is used in preparation of foundations, water tight floors, footpaths etc.
  • It is applicable for construction of wells, water tanks, tennis courts, lamp posts, telephone cabins, roads etc.

Such type of project are evolving for the analysis of the cement to be used in construction. They must have certain given qualities in order to play its part effectively in a structure. When these properties recline within a certain range, the engineer is confident that in most of the cases the cement’s performance will be satisfactory. Also, based on these properties, it is possible to compare the quality of cement from different sources.

Table 1 shows the characteristics of different components that are used in manufacture of cement and also gives the information about the range within which these properties should recline.

Table 1: Characteristics of Components of Cement

S.N.CharacteristicsAs per 53 Grade
AChemical Characteristics 
1LSF (Lime Saturation Factor)0.66-1.01
2AM (Alumina Modulus)0.669(min)
3Insoluble Residue(% Mass)2%(max)
4Magnesia (% Mass)6%(max)
5Sulphuric Trioxide(SO3)3%(max)
6Total Loss on Ignition4%(max)
BPhysical Characteristics 
1Specific Surface(CM^2/g)225m2/kg(min)
2Setting time(minutes) 
AInitial Setting TimeNot less than 30 mins
BFinal Setting TimeNot less than 600 mins
3Soundness 
ABy Le-Chataller(MM)10mm (max)
BBy Auto clave (%)0.8%(max)
4Compressive Test(N/mm^2) 
A072±1hour; 3 days27MPa(min)
B168±1hours; 7 days37MPa(min)
C672±4hours; 28days53MPa(min)

(NBC101:1994, 2064), (IS8112:1989, 2005), (IS12269:1987, 1988).

Among the characteristics that are mentioned in the table 1, only initial setting time, final setting time and soundness are used for the analysis.   

2.1  Chemical and Physical Characteristics of Cement

  • Lime Saturation Factor (LSF):

The Lime Saturation Factor is a ratio of CaO to the other three main oxides. Applied to clinker, it is calculated as: LSF = CaO/(2.8SiO2+1.2Al2O3+0.65Fe2O3) Where, CaO = Lime, SiO2 = Silica, Al2O3 = Alumina and Fe2O3 = Iron oxide Often, this is referred to as a percentage and therefore multiplied by 100. The LSF controls the ratio of aliteto belitein the clinker. A clinker with a higher LSF has a higher proportion of alite to belite than a clinker with a low LSF. Typical LSF values in modern clinkers are 0.92-0.98 or 92% – 98%. The Lime saturation factor has a great role on the compressive strength of the cement. If this factor exceeds the margin (90-98%) then, large clusters of belite are present in the clinker that adverse the grinding of the clinker (Ibrahimi, Jamaa, Bagane, Ammar, Lecomte, & and Diliberto, 2015). According to Nepal Standard (N.S) and Indian Standard (I.S) the lime saturation factor can be in the range 0.66 –1.02.

  • Alumina Modulus (AM):

It shows the factor or ratio or proportion of iron oxide and alumina. It was also called alumina ratio. Alumina Modulus = Al2O3/Fe2O3 Values of alumina ratio are in the range from 1.5 to 2.5.The AR determines the composition of liquid phase in the clinker, when it’s lower than 1.5 both oxides are present in their molecular ratios and therefore only tetra calcium alumino ferrite can be formed in the clinker; consequently, the clinker cannot contain tricalcium aluminate. This is the case called Ferrari-cement which is characterized by low heat of hydration, slow setting and low shrinking. A high alumina ratio together with a low silica ratio results among other things, in a fast setting of the cement; this requires the addition of a higher gypsum rate to control the setting time. However, the limitation set by Nepal standard and Indian standard for Alumina modulus is minimum 0.66.

  • Insoluble Residue:

Insoluble residue is a non – cementing material which is present in Portland cement. This residue material affects the properties of cement, especially its compressive strength. To control the non – cementing material in Portland cement, American Society for Testing and Materials (ASTM) allows the insoluble residue to be nothing more than 0.75%.This limitation is much lower   than the allowance provided by the British standard which is 1.5%. However, the limitation set by the

Nepal standard early age and the figure was also found to be reduced as the cement mortar was older with 7.28% of insoluble residue in the mortar at 1 day, the compressive strength was reduced by 11.5%, but after 60 days, the strength of the same mortar was only reduced by 5.5% as compared to the control mortar. It was also found that the compressive strength of Portland cement mortar with insoluble residue provided by ASTM standard or British standard was still higher than the compressive strength of Portland cement mortar type I allowed by the standards. The limit of insoluble residue given by ASTM standard as 0.75 is rather low and can possibly be increased to 1.5% according to British standard, or even slightly higher, without significantly reducing the compressive strength of cement.

  • Magnesia (MgO):

Magnesium hydroxide occupies more volume and puts stress on the hardened concrete. This leads to cracks in the concrete structure. As time goes by, these cracks grow deeper, causing leakages or irreparable damage to the structure. Magnesia is one of the major culprits behind late expansion cracks in concrete. Due to formation of expansion cracks in concrete due to volume expansion of magnesia, the durability of concrete will be very poor. MgO in excess of about 2% appears in the clinker as free MgO. MgO present 1-1.5% in clinker is a very good mineralizer and improves nodulation. If it is quenched it does not give expansion problems. Good nodules are always preferred in burning and it helps in improving cooling efficiency and there by recovering thermal energy from clinker. Within the kiln MgO increases the liquid phase and may therefore promote the formation of clinker minerals. However, too much MgO can increase the liquid phase to problematic amounts and cause excessive coating and even balling of the clinker. MgO at about 2-5% can improve the burn ability of raw mill, promote the absorption of free lime, increase the strength development of cement and shorten the setting time.

  • Sulphuric Trioxide(SO3):

To control setting time effectively, cement needs a minimum amount of calcium sulfate, mostly in the form of gypsum added to the clinker. As per N.S and I.S, the maximum allowable SO3– content in the cement is 3% to prevent sulfate expansion. It was reported that increasing the SO3 content above 3.0% had negative effects on durability assessed by strength or expansion measurements.

  • Total Loss on Ignition(LOI):

Ignition loss (LOI) represents the % weight loss suffered by a sample of cement after heating to 900 – 1000°C (1650 – 1830°F). Any water bonded to hydrated cement particles is expelled above this temperature. The higher the LOI, the less strength the cement will develop. As an indicator it can be used to monitor and improve the quality of the final cement.

N.S and I.Slimit the LOI to maximum 4.0%.

  • Specific Surface Area(S.S.A):

Specific surface area of a porous material is defined as the surface area of pores per unit mass or per unit bulk volume of the porous material. For two materials with the same total pore volume, the material with fine pores has a much greater specific surface area than the material with large pores. It is given by the following equation: S.S.A = As / Vb or, S.S.A = As / m Where, As = total surface area of the pores, Vb = bulk volume of the material, and m = mass of the material (Aligizaki, 2006) Cement fineness is expressed in terms of Particle Size Distribution (PSD) with residues (or passing) on reference sieves or by its specific surface area in Blaine. There are three methods commonly in use at present time to determine the S.S.A. They are Blaine Air Permeability Method, Lea and Nurse Air Permeability, and Wagner Turbidity Meter. Specific surface is expressed as the total surface area in square meters of all the cement particles in one kilogram of cement. The higher the specific surface area, the cement is said to be finer. The size of a cement particle has an important effect on the rate at which it will hydrate when exposed to water. As it reacts, a layer of hydration product forms around the outside of the particle, separating the unreacted core of the particle from the surrounding water. As the layer grows thicker, the rate of hydration slows down. Therefore, a small particle will react much more quickly than a large particle.

  • Setting Time:

Cement when mixed with water forms paste which gradually becomes less plastic, and finally a hard mass is obtained. In the process of setting, a stage is reached when the cement paste is sufficiently rigid to withstand a definite amount of pressure. The time to reach this stage is termed as setting time.

Setting time is divided into two types:

  1. Initial Setting Time – The time at which the cement paste loses its plasticity is termed as the initial setting time.
  2. Final Setting Time – The time taken to reach the stage when the paste becomes a hard mass is known as the final setting time. For an OPC, the initial setting time should not be less than 30 minutes and final setting time should not be more than 600 minutes. In practice, the length of time for which a concrete mixture will remain plastic is usually more dependent on the amount of mixing water used and atmospheric temperature than on the setting time of cement.
  • Soundness

The change in the volume of hardened concrete due to delayed or slow hydration of free lime, magnesia and calcium sulfate present in cement is known as unsoundness. It causes undesirable stresses resulting in cracks. It is essential that concrete does not undergo a large change in volume after it has set. The tests for unsoundness are the Le Chatelier and Autoclave tests. According to N.S and I.S, the expansion carried out should not be more than 10 mm in the Le Chatlier test and 0.8% in Autoclave test.

  • Compressive Strength:

Cement mortar cubes (1:4) having an area (150*150) mm2are prepared and tested in compression testing machine. Standard sand (IS: 650) is used for the preparation of cement mortar.

  • Consistency test

This test is conducted to determine the percentage of water required for preparing cement paste of standard consistency for various tests. This test is performed by vicat’s apparatus. The standard consistency value ranges from 33%to35%.

  • Fineness test:

The objective of conducting this test is to check the proper grinding of cement as finer cements has quicker action with water and gain early strength.

Finer the cement, more surface area of the aggregate covered by it. The fineness of cement is tested by sieve test. The standard value of fineness ranges from 6% to 10%.

2.2  Workability

Good cement possesses the following properties (which depends upon its chemical composition, thoroughness of burning and fineness of grinding).

  1. Provides strength to the masonry.
  2. Stiffens and hardens early.
  3. Possesses good plasticity.
  4. An excellent building material.
  5. Easily workable.
  6. Good moisture resistant.

CHAPTER 3

METHODOLOGY

This research is limited to the cost and quality comparison of different brands of cement found around Kathmandu Valley. The research was focused to assess the cement cost and quality by comparing the cement in terms of their quality and price. All the data required were taken from the different websites mentioned in the reference section.

3.1  Data Collection

The required data were collected from the following source:

  • Secondary source:

Data for various tests such as setting time, fineness, consistency and compressive strength of cement were taken from different websites on selected brands of cement to evaluate the qualitative properties of cement. Various publications, reports and standard codes set by Nepal and India related with the research objectives were studied and reviewed. The publications, reports, and standard codes were taken from libraries and internet.

Table 2: Cost comparison of different brands of cement

The table shown below gives the information about the cost per kg of different brands of cement available in the market of Kathmandu valley.

S.N.ParticularsPrice per 50 kg bagPrice per kg
1Shivam CementRs. 820Rs. 16.4
2Sagarmatha CementRs. 750Rs. 15
3Agni CementRs. 740Rs. 14.8
4Mangala CementRs. 730Rs. 14.6
3.2  Lab Tests on Cement

For Physical Properties

  1. Setting Time of Cement

Vicat’s apparatus is used to find the setting times of cement i.e., initial setting time and final setting time.

  • Initial Setting Time
    • For this test, a needle of 1 mm square size is used. The needle is allowed to penetrate into the paste.
    • The time taken to penetrate 33-35 mm depth is recorded as the initial setting time.
  • Final Setting Time
    • For determining the final setting time, the needle of the Vicat’s apparatus was replaced by the needle with an annular attachment.
    • The time (t3) was recorded when the annular attachment failed to make an impression on the surface of the test block.
  • Results

Initial setting time = t2-t1

Final setting time= t3-t1,

Where,

t1=Time when water was added to cement.

t2=Time when needle failed to penetrate 5 mm to 7 mm from bottom of the mould.

t3=Time when the needle made an impression but the attachment failed to do so.

Fig 1: Vicat Apparatus

2. Compressive Strength

Cement mortar cubes (1:4) having an area (150*150) mm2 were prepared (i.e. three cubes of cement) and tested in compression testing machine. The compressive strength at 7 days was found out.

Procedure:

2kg of different brands of cement was added and 4 kg of sand was added and 8 kg coarse aggregate was mixed together and tested for 7 days.

The second day of testing cement cubes was kept in water and was taken out from cube box.

Table 3: Assumed cubes sizes

Grade of conc.CementFine sandCoarse sandW/C ratio maximum
M15124.64
(IS: 456-2000, 2002)

3. Consistency test:

300 gm of cement was taken and approximately 35% of water was mixed in various brands of cement and the consistency was determined and the initial and final readings were noted. In this test plunger needle was used.

4. Fineness test:

100 gm of cement was taken and was shaken for 10 minutes. The fineness of the cement was taken by measuring the weight of residue in laboratory. This process is done by sieve analysis process.

Source: https://www.flickr.com/photos/wessexarchaeology/298018307
 
Fig 3: 90 micron sieve
3.3  Cost Analysis

Cost analysis was done by:

  • Based on purchase: – First of all, the market price of cement per bag was tabulated. Then, the transportation cost to site from market was kept in consideration.
  • Based on quality: – All the performed tests showed the result of quality of cement based on consistency, fineness, setting time, compressive strength which helps in making the construction in low cost.

CHAPTER 4

RESULTS AND DISCUSSION

A, M, S and SA cements were analyzed by the data taken from secondary source and the results were concluded as below:

Table 4 give the information about the quantity of water added to the cement and the initial setting time of the cement.

Table 4: Initial test

S.N.Quantity of cementWater added (ml)Brands of cementTime taken (in mins)ResultRemarks
1.300 gm81.6A365Fail
2.300 gm89.25S456Pass
3.300 gm76.5SA486Pass
4.300 gm84.5M644Fail

 Form Vicat apparatus test and the results obtained from the test we conclude that Shivam Cement & Sagarmatha Cement has the best initial setting time.  

 Table 5 gives the information about the compressive strength for the cement mortar cubes of    different brands of cement.

Table 5: Compressive strength test

S.NBrands of cementDaysAverage    weight (kg)Compressive Strength ( N/mm2)Remarks
1.A7
2.S7120005.3Very good
3.SA790004Good
4.M745002Very poor

    From the above test Shivam cement has highest compressive strength than the other brands of cement so we conclude Shivam cement is best.

Table 6 gives the information about the fineness test for the cement.

Table 6: Fineness Test

S.N.Brands of cementTime Duration (mins)Fineness PercentageRemarks
1A108%Good
2S107%Good
3SA1010%Good
4M1012%Poor

From the above table, we can conclude that among those brands of cement Shivam has the least fineness percentage so Shivam is the best.

Table 7 shows the consistency of different brands of cement

Table 7: Consistency test

S.NBrands of cementWeight of cement taken (in gm)Water added to design mix(in ml)Final consistencyremarks
1.A3009633good
2.S30010533good
3.SA3009030poor
4.M3009932poor

From the above table, Shivam cement has the greater final consistency. So, Shivam cement is best among those.

Source: https://www.researchgate.net/publication/330542459_Quality_Assessment_of_Cements_of_Nepal

CHAPTER 5

CONCLUSION AND RECOMMENDATIONS

5.1  Conclusion:

From the secondary sources, we found that Shivam cement is best cement and the most popular brand of cement used for construction purposes in Kathmandu valley.

Among the four brands of cement, that were taken into consideration for this project Shivam cement has good remarks in terms of every test whereas Mangala cement had very poor results. Although Sagarmatha and Aagni showed satisfying results. From the cost comparison table we can clearly see that Mangala is cheaper and Shivam is more expensive among them.

5.2  Recommendations:

Quality of cement is most essential things in construction. So, keeping the quality into consideration Shivam cement is best as it gives quality although its cost is high. For long life span of any civil engineering projects, Shivam cement is most recommended as it gives best quality than other brands of cement

References:
  • AligizakiK. Definition of Pore Structure parameters.2006. In K. Aligizaki, Pore Structure of Cement-Based Materials Testing, Interpretation and Requirements (p. 19). Taylor and FrancisGroup.https://www.highwayguide.co.in/compressive-strength-test-of-cement-mortar-cube-as-per-is-4031-part-6/Association of Engineers. Reduction of Strength of Cement. In Civil Engineer’s Hand Book. 1981Kerala: Kerala Public Works Department
  • NBC101:1994. (2064). NS 49/2041 Ordinary Portland Cement. Department of Building, Urban Development and Building Construction. Kathmandu: Government of Nepal Physical Planning and Works.
  • Winter N. (2005). Understanding Cement – Interpreting Cement Science Since 2005. (WHD Microanalysis Consultants Ltd.) Retrieved December 04, 2017, from Understanding Cement – Interpreting Cement Science Since 2005: https://www.understanding-cement.com/parameters.html#
  • Er. R.K Rajput, 2000,”Engineering materials”, 4th revised edition 2010, S.Chand.
  • Prof. Prabin Singh, 1965, “Civil Engineering Materials”, 6th edition 2013, S.K Kataria andSons.
  • Mishra AK, Regmi U. Effects of Price Fluctuationon the Financial Capacity of “Class A” Contractors.International Journal of Creative Research Thoughts 2017

The post QUALITY AND COST COMPARISON OF DIFFERENT BRANDS OF CEMENT AVAILABLE IN MARKET OF KATHMANDU VALLEY appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2022/03/04/quality-and-cost-comparison-of-different-brands-of-cement-available-in-market-of-kathmandu-valley/feed/ 0
Engineering geology in Himalayas https://onlineengineeringnotes.com/2021/04/12/engineering-geology-in-himalayas/ https://onlineengineeringnotes.com/2021/04/12/engineering-geology-in-himalayas/#respond Mon, 12 Apr 2021 12:24:43 +0000 https://onlineengineeringnotes.com/?p=401 Formation of Himalaya Shifting of Indian plate Block Diagram of The Himalaya The Nepal Himalaya • The longest division of the Himalaya• Extended about 800 Km• Starts from west at the Mahakali River• Ends at the east by the Tista River Longitudinal Division of Himalayan Range Terai Zone (Gangetic Plain) • Northern Terai(Bhabhar Zone)• Middle ... Read more

The post Engineering geology in Himalayas appeared first on OnlineEngineeringNotes.

]]>

Formation of Himalaya

Shifting of Indian plate

Block Diagram of The Himalaya

The Nepal Himalaya

• The longest division of the Himalaya
• Extended about 800 Km
• Starts from west at the Mahakali River
• Ends at the east by the Tista River

Longitudinal Division of Himalayan Range

Terai Zone (Gangetic Plain)

• Northern Terai
(Bhabhar Zone)
• Middle Terai
(Marshy) Zone
• Southern Terai Zone

Major problems in terai zone

• Flood
• Liquifaction
• Bank cutting
• Subsidences

Himalayan Frontal Thrust (HFT) Separating Terai (S) from Siwaliks (N) at Butwal

The Sub-Himalayan Zone (Siwaliks)

• Delimited on the south by the Main Frontal Thrust (MFT) and on the
north by the Main Boundary Thrust (MBT)
• Fluvial deposits of 23 Ma to 1.6 Ma old
Siwaliks can be classified as
• Lower Siwaliks (Greenish grey fine-grained sandstone and siltstone
with mudstone)
• Middle Siwaliks (Medium to coarse-grained salt-and-pepper
sandstones with colorful mudstone)
• Upper Siwaliks (Conglomerate and boulder beds and
subordinately sand and silt beds)

Main Boundary Thrust (MBT) in Dang

Major problems in Siwaliks

• Mass movement
• Erosion
• Weathering

Lesser Himalayan Zone

This zone Mainly contains
• Unfossiliferous, sedimentary, and metasedimentary rocks:
Such as slate, phyllite, schist, quartzite, limestone, dolomite, etc of very old
age (1600 Ma to 22 Ma)
• There are also some granitic intrusions in this zone
• In Eastern Nepal, high grade metamorphic rocks (gneiss and
schist)
• In Central Nepal, Medium to high grade metamorphic rocks
• In western Nepal around Gandaki and Bheri River, Low
grade of metamorphic rocks (quartzite, slate, and phyllite)
• In Far western Nepal, again high metamorphic rocks are
reappear.

Major problems in lesser Himalaya

• Mass movement:
• Rock slide,
• Rock fall
• Rock toppling
• Debris avalanche,
• Deep gully erosion,
• Wedge failure
• Flash flood

Main Central Thrust (MCT) at Myagdi

Higher Himalayan Zone

• Mainly consists of strongly metamorphosed rocks
• Separated with Tibetan-Tethys Zone by Normal
Faults
• Gneisses, schists, quartzites and marbles and
granites

Major problems of Higher Himalaya

• Mass movement
• GLOF
• Snow avalanches

Tibetan-Tethys Himalayan Zone

• It begins from the top of the Higher Himalayan
Zone and extends to the north in Tibet
• Well-developed in Mustang, Manang and Dolpa
area
• Composed of sedimentary rocks, such as shale,
limestone, and sandstone, ranging in age from 550
Millions age to 23 Millions age

Engineering Geological Problems in Himalayas

Terai Zone

Main rock type : Alluvium

Plane area has mainly problem of floods.

Siwaliks Zone

Main rock type: Shale, Conglomerate, Sandstone, Mudstone.

Composed of loose rock problem of relatively small and shallow slope failure.

Lesser Himalayan Zone

Main rock type: Slate, Phyllite, Schist, Genesis, Limestone, Dolomite, Quartzite.

Old hard rock, thick soil formation, thick colluvium deposits in lower part of mountain slope, problem of large slope failure.

Higher Himalayan Zone

Main rock type : Genesis, Schist, Quartzite.

Less soil formation, steep slopes, mainly rock slope failures.

Tibetan Tethys Himalayan Zone

Main rock type: Limestone, Shale, Sandstone.

No soil formation, barren slope, rock slope failure, wind erosion, debris avalanche.

Why Himalayas are so vulnerable ????

• High relief (60-8848m): Slope failure,
• Active tectonics: Weak, unstable and permeable
thrust zone
• Seismically active
• Mass movement
• Concentrated Precipitation (93% in summer, 37%
in 24 hrs)

Hostile Natural Environment of Himalaya

The post Engineering geology in Himalayas appeared first on OnlineEngineeringNotes.

]]>
https://onlineengineeringnotes.com/2021/04/12/engineering-geology-in-himalayas/feed/ 0